Front Bank, Back Ditch on Contour Terraces
Type: Approaches
Creation: 2008-12-31 00:00 Updated: 2017-07-12 15:24
Compilers: Unknown User
Reviewers: Laura Ebneter
Country/ region/ locations where the Approach has been applied
- Country: China
- Region/ State/ Province: Fujian
- Map: View Map
Description of the SLM Approach
Short description of the Approach
Using contour principle, constructing terraces with the front bank and back ditch in order to control soil & water erosion.
Detailed description of the Approach
In the area with sufficient rainfall, overflow and runoff often destroy the existing terraces causing much cost for maintaining. Sluice system of terraces is important when building a terrace. The technology of the Front Bank and Back Ditch on Terrace is to solve this problem. The approach is that building front bank on a terrace edge and digging a ditch on the back terrace as well as digging a ditch upright the terrace along a relatively low rill to induct overflow out.