Front Bank, Back Ditch on Contour Terraces

Type: Approaches

Creation: 2008-12-31 00:00   Updated: 2017-07-12 15:24

Compilers: Unknown User

Reviewers: Laura Ebneter

Country/ region/ locations where the Approach has been applied
  • Country: China
  • Region/ State/ Province: Fujian
  • Map: View Map

Description of the SLM Approach

Short description of the Approach

Using contour principle, constructing terraces with the front bank and back ditch in order to control soil & water erosion.

Detailed description of the Approach

In the area with sufficient rainfall, overflow and runoff often destroy the existing terraces causing much cost for maintaining. Sluice system of terraces is important when building a terrace. The technology of the Front Bank and Back Ditch on Terrace is to solve this problem. The approach is that building front bank on a terrace edge and digging a ditch on the back terrace as well as digging a ditch upright the terrace along a relatively low rill to induct overflow out.

Photos of the Approach

Image Location of the Front Bank and Back Ditch on Terraces in Fengting Town.
Location of the Front Bank and Back Ditch on Terraces in Fengting Town.
Image Front Bank, Back ditch on the terraces in Fengting town.
Front Bank, Back ditch on the terraces in Fengting town.