Check Dam

Type: Technologies

Creation: 2010-12-14 13:32   Updated: 2019-03-14 15:53

Compilers: Haiyan WEI

Reviewers: David Streiff, Alexandra Gavilano

Country/ region/ locations where the Technology has been applied and which are covered by this assessment
  • Country: China
  • Region/ State/ Province: Shanxi, Beijing
  • Map: View Map

Description of the SLM Technology

Short description of the Technology

Check dam refers to dam that constructed in the gullies or river ways and the height of the dam is often lower than 5m.

Detailed description of the Technology

Check dams are built in the gully systems to harvest water and sediment. Usually many check dams are built in a gully or waterway to control the gully erosion. Check dams can be classified into "masonry dam", "check dam of earth", "check dam with willow" according to materials. Some strong masonry can last more than 10 years. As willow pegs in the "check dam with willow" can grow into timber after years.
Maintenance work should be done before rainy seasons every year so as to prevent the dam from destruction.
Following are the building procedures:

Masonry dam & check dam using earth:
1. Preparation---Removing grass, roots and surface soil; Digging a channel along an axis of a check dam in order to combine the dam and the bed firmly.
2. Construction---If a dam is planned to be made of earth, do scarification first, then adding earth (about 0.3m thick) and ramming it into 0.2m layer by layer. Building the dam with stones and/or rocks.
3. Base---If a bed of a gully consists of earth or sand, "base" should be built at the downstream feet of the dam. Length of the base should be twice as that of the dam and thickness should be 50-70cm.
4. Building a spillway at the top of the dam.

Check dam with willow:
1. Removing grass, roots and surface soil.
2. Cutting branches from willow; chopping the branches into pegs with the thick ends wedge.
3. Inserting the pegs into the ground.
4. Entwining wattles from willows around the pegs compactly.
5. Filling the space between two rows of pegs with stones, bricks, treetops etc. Making the stuff surface 10cm lower than the pegtop.
6. Combining the dam into a whole with iron chains.

Photos of the Technology

Image Pattern of Check Dam in a gully.
Pattern of Check Dam in a gully.
  • 📍 the Loess Plateau, Shanxi, Beijing
  • 🗓 2001-01-06
  • 📷 LIU Baoyuan (Beijing China)